01 / 问题
出了什么问题。
Live, flowing leaks in concrete cannot be sealed with surface treatments. The water pressure simply blows the patch off.
02 / 解决方案
我们如何修复。
Injection of expanding hydrophobic polyurethane resin into the crack. The PU reacts with water, foams to 20× volume, and physically blocks the leak path while bonding to the substrate.
03 / 项目照片

04 / 材料
授权应用商产品。
- SIKA Injection-101 RC
- FOSROC Conbextra GP
- DENKA Hydro-Stop
05 / 范围与时间
包含哪些内容。
- 范围
- Crack mapping, packer drilling, resin injection, packer removal, surface dressing.
- 典型工期
- 1–3 days per typical crack pattern.
06 / 服务区域
我们的服务范围。
- Kuala Lumpur
- Petaling Jaya
- Subang Jaya
- Shah Alam
- Mont Kiara
- Bangsar
- Damansara Heights
- TTDI
- Sri Hartamas
- Cheras
- Selayang
- Batu Caves
- Puchong
- Kepong
- Setapak
- Wangsa Maju
- Ampang
- Setia Alam
- Kota Damansara
- Sungai Buloh
- Cyberjaya
- Putrajaya
- Kajang
- Klang
- Nilai
07 / 常见问题
该服务的常见问题。
Often yes. If the existing patch is on the dry side, we typically drill from the wet side and inject behind it — sealing the original path.
Related guides
More on this from our guide library.
PU Grouting vs Epoxy Injection: Which One for Your Leak?
PU grouting stops active water leaks; epoxy injection restores structural strength. Use this 2026 guide to choose the right system for cracks, lift pits and basements.
Read →
Inter-Floor Leak Condo Malaysia | Strata Leak Repair | ODSCC
ODSCC repairs inter-floor leaks in Malaysian condos. Independent leak source identification under Strata Management Act 2013. Technical report for both parties.
Read →
Lift Pit Flooding Malaysia | Emergency Response & Permanent Fix | ODSCC
Water in your lift pit damages the lift mechanism, voids the manufacturer warranty, and creates an electrical hazard. Step-by-step emergency response and permanent waterproofing.
Read →