Skip to content
ODS Construction ChemicalsODSCC

修复

混凝土修复

Spalled slabs, damaged columns, exposed rebar — restored to original strength using FOSROC and SIKA repair systems.

01 / 问题

出了什么问题。

Spalled concrete, exposed rebar, or impact damage compromise structural integrity and accelerate deterioration if left unrepaired.

02 / 解决方案

我们如何修复。

Surface preparation to sound substrate, rebar treatment with anti-corrosion primer, polymer-modified mortar reinstatement, and protective coating.

03 / 项目照片

混凝土修复 — project photo 1
混凝土修复 — project photo 2
混凝土修复 — project photo 3
混凝土修复 — project photo 4

04 / 材料

授权应用商产品。

  • FOSROC Renderoc HB40
  • SIKA MonoTop-412
  • MAPEI Mapegrout

05 / 范围与时间

包含哪些内容。

范围
Damage assessment, breakout, rebar treatment, formwork, mortar reinstatement, finish coat.
典型工期
Highly variable — typical column repair: 2–4 days. Large slab area: 1–2 weeks.

06 / 服务区域

我们的服务范围。

  • Kuala Lumpur
  • Petaling Jaya
  • Subang Jaya
  • Shah Alam
  • Mont Kiara
  • Bangsar
  • Damansara Heights
  • TTDI
  • Sri Hartamas
  • Cheras
  • Selayang
  • Batu Caves
  • Puchong
  • Kepong
  • Setapak
  • Wangsa Maju
  • Ampang
  • Setia Alam
  • Kota Damansara
  • Sungai Buloh
  • Cyberjaya
  • Putrajaya
  • Kajang
  • Klang
  • Nilai

07 / 常见问题

该服务的常见问题。

Related guides

More on this from our guide library.