Skip to content
ODS Construction ChemicalsODSCC

Repair

Concrete Repair

Spalled slabs, damaged columns, exposed rebar — restored to original strength using FOSROC and SIKA repair systems.

01 / The problem

What goes wrong.

Spalled concrete, exposed rebar, or impact damage compromise structural integrity and accelerate deterioration if left unrepaired.

02 / The solution

How we fix it.

Surface preparation to sound substrate, rebar treatment with anti-corrosion primer, polymer-modified mortar reinstatement, and protective coating.

03 / Project photos

Concrete Repair — project photo 1
Concrete Repair — project photo 2
Concrete Repair — project photo 3
Concrete Repair — project photo 4

04 / Materials

Authorised-applicator products.

  • FOSROC Renderoc HB40
  • SIKA MonoTop-412
  • MAPEI Mapegrout

05 / Scope & timeline

What's included.

Scope
Damage assessment, breakout, rebar treatment, formwork, mortar reinstatement, finish coat.
Typical timeline
Highly variable — typical column repair: 2–4 days. Large slab area: 1–2 weeks.

06 / Service areas

Where we work.

  • Kuala Lumpur
  • Petaling Jaya
  • Subang Jaya
  • Shah Alam
  • Mont Kiara
  • Bangsar
  • Damansara Heights
  • TTDI
  • Sri Hartamas
  • Cheras
  • Selayang
  • Batu Caves
  • Puchong
  • Kepong
  • Setapak
  • Wangsa Maju
  • Ampang
  • Setia Alam
  • Kota Damansara
  • Sungai Buloh
  • Cyberjaya
  • Putrajaya
  • Kajang
  • Klang
  • Nilai

07 / FAQ

Service-specific questions.

Related guides

More on this from our guide library.