Skip to content
ODS Construction ChemicalsODSCC

专项

装修

Full-scope renovation projects backed by 33 years of structural know-how.

01 / 问题

出了什么问题。

Renovation contractors often gloss over waterproofing and structural prep — the new finish looks great for 18 months, then the underlying problems resurface.

02 / 解决方案

我们如何修复。

Our renovation scope always includes a waterproofing and substrate audit, fixed before the finishes go in. The decorative result lasts because the structural foundation is sound.

03 / 项目照片

装修 — project photo 1

04 / 材料

授权应用商产品。

  • Project-specific

05 / 范围与时间

包含哪些内容。

范围
Audit, structural prep, waterproofing, MEP coordination, finishes, hand-over.
典型工期
Project-specific.

06 / 服务区域

我们的服务范围。

  • Kuala Lumpur
  • Petaling Jaya
  • Subang Jaya
  • Shah Alam
  • Mont Kiara
  • Bangsar
  • Damansara Heights
  • TTDI
  • Sri Hartamas
  • Cheras
  • Selayang
  • Batu Caves
  • Puchong
  • Kepong
  • Setapak
  • Wangsa Maju
  • Ampang
  • Setia Alam
  • Kota Damansara
  • Sungai Buloh
  • Cyberjaya
  • Putrajaya
  • Kajang
  • Klang
  • Nilai

07 / 常见问题

该服务的常见问题。

Related guides

More on this from our guide library.