Skip to content
ODS Construction ChemicalsODSCC

Kalis Air

Kalis Air Lubang Lif

Crystalline + cementitious systems for lift pits subject to constant ground water.

01 / Masalah

Apa yang salah.

Lift pits sit at the lowest point of a building, taking the full hydrostatic load. Water in the pit corrodes the lift mechanism, voids manufacturer warranty, and creates a serious safety hazard.

02 / Penyelesaian

Bagaimana kami betulkan.

A two-stage system: crystalline admixture seals capillaries in the concrete itself, then a cementitious top coat finishes the surface. Active leaks first stopped with PU injection.

03 / Foto projek

Kalis Air Lubang Lif — project photo 1
Kalis Air Lubang Lif — project photo 2
Kalis Air Lubang Lif — project photo 3

04 / Bahan

Produk pemohon yang diiktiraf.

  • PENTENS Crystalline Plus
  • FOSROC Brushbond RFX
  • SIKA-1 System

05 / Skop & garis masa

Apa yang termasuk.

Skop
Dewatering, leak injection, surface prep, crystalline application, cementitious top coat, hand-over.
Garis masa biasa
4–7 days, including curing time.

06 / Kawasan perkhidmatan

Di mana kami bekerja.

  • Kuala Lumpur
  • Petaling Jaya
  • Subang Jaya
  • Shah Alam
  • Mont Kiara
  • Bangsar
  • Damansara Heights
  • TTDI
  • Sri Hartamas
  • Cheras
  • Selayang
  • Batu Caves
  • Puchong
  • Kepong
  • Setapak
  • Wangsa Maju
  • Ampang
  • Setia Alam
  • Kota Damansara
  • Sungai Buloh
  • Cyberjaya
  • Putrajaya
  • Kajang
  • Klang
  • Nilai

07 / Soalan Lazim

Soalan khusus perkhidmatan.

Related guides

More on this from our guide library.