Skip to content
ODS Construction ChemicalsODSCC

Waterproofing

Lift Pit Waterproofing

Crystalline + cementitious systems for lift pits subject to constant ground water.

01 / The problem

What goes wrong.

Lift pits sit at the lowest point of a building, taking the full hydrostatic load. Water in the pit corrodes the lift mechanism, voids manufacturer warranty, and creates a serious safety hazard.

02 / The solution

How we fix it.

A two-stage system: crystalline admixture seals capillaries in the concrete itself, then a cementitious top coat finishes the surface. Active leaks first stopped with PU injection.

03 / Project photos

Lift Pit Waterproofing — project photo 1
Lift Pit Waterproofing — project photo 2
Lift Pit Waterproofing — project photo 3

04 / Materials

Authorised-applicator products.

  • PENTENS Crystalline Plus
  • FOSROC Brushbond RFX
  • SIKA-1 System

05 / Scope & timeline

What's included.

Scope
Dewatering, leak injection, surface prep, crystalline application, cementitious top coat, hand-over.
Typical timeline
4–7 days, including curing time.

06 / Service areas

Where we work.

  • Kuala Lumpur
  • Petaling Jaya
  • Subang Jaya
  • Shah Alam
  • Mont Kiara
  • Bangsar
  • Damansara Heights
  • TTDI
  • Sri Hartamas
  • Cheras
  • Selayang
  • Batu Caves
  • Puchong
  • Kepong
  • Setapak
  • Wangsa Maju
  • Ampang
  • Setia Alam
  • Kota Damansara
  • Sungai Buloh
  • Cyberjaya
  • Putrajaya
  • Kajang
  • Klang
  • Nilai

07 / FAQ

Service-specific questions.

Related guides

More on this from our guide library.