01 / Overview
Bathroom Waterproofing for Kuala Lumpur buildings.
A wet patch on the ceiling of the unit below is almost always a bathroom-floor membrane failure on the unit above. ODSCC re-waterproofs KL bathrooms using SIKA, FOSROC and MAPEI cementitious and acrylic membrane systems. We coordinate with the owners of both units, write a JMB-ready scope, and complete most KL bathroom jobs in 4-7 working days. CIDB G5, IRATEC certified.
02 / Why Kuala Lumpur
Local building stock & failure patterns.
Inter-unit bathroom leaks are the single most common waterproofing call we get in KL. The 1990s and early-2000s KL condominium stock (Setapak, Wangsa Maju, Ampang, Cheras, Sri Hartamas, parts of Kepong) was built with first-generation cementitious bathroom membranes that are now well past their effective service life. The pattern is almost identical building-to-building: the upstairs owner notices nothing because the leak goes downward; the downstairs owner discovers a yellowing patch on the ceiling and reports it to the JMB. The JMB then has to mediate between two unit owners, and frequently neither wants to bear the cost. Older KL walk-ups (Pudu, Brickfields, Jalan Ipoh, Setapak) have an additional complication: many have had bathroom tiling redone two or three times since the original construction, and each re-tile usually skipped re-waterproofing — so the substrate is now layered with old grout-impregnated thin-sets. The right fix is to hack back to the bare slab, re-do the falls toward the floor trap, apply a flexible cementitious membrane (SIKA SikaLastic, FOSROC Nitoproof) with reinforcement at corners and pipe penetrations, and re-tile.
03 / Typical scope
What we deliver on site.
A typical KL bathroom waterproofing job: hack and dispose of existing tiles, thin-set and screed; check the slab for cracks and inject if needed; re-do falls with sloping screed toward the floor trap; apply two-coat flexible cementitious or acrylic membrane (SIKA SikaLastic 152, FOSROC Nitoproof 600, MAPEI Mapelastic) with fibre-mesh reinforcement at all corners, upstands and penetrations; flood test for 24 hours; re-tile with new thin-set and grout. Most KL bathrooms complete in 4-7 working days. The unit above stays unoccupied for the duration; the unit below is unaffected.
Full service overview: Bathroom Waterproofing.
04 / FAQ
Questions from Kuala Lumpur clients.
05 / Why ODSCC
Klang Valley waterproofing since 1997.
- CIDB G5 since 1997 — eligible to quote on JMB and MC tenders directly.
- IRATEC-certified for industrial rope-access work at height.
- Authorised applicator for SIKA, FOSROC, MAPEI, BOSTIK, PENTENS and DENKA construction-chemical systems.
- Site visits across the Klang Valley for projects we can take on — no charge for the visit itself.