Skip to content
ODS Construction ChemicalsODSCC

Waterproofing

Basement Waterproofing

Negative- and positive-side waterproofing for basements, car parks, and below-grade structures.

01 / The problem

What goes wrong.

Basements face constant hydrostatic pressure. Water finds its way through cold joints, tie-bolt holes, and shrinkage cracks — appearing as efflorescence on walls or wet patches on floors.

02 / The solution

How we fix it.

A combination strategy: crystalline admixtures into new concrete pours, polyurethane injection for active leaks, and cementitious slurries on the negative side to seal porous surfaces.

03 / Project photos

Basement Waterproofing — project photo 1

04 / Materials

Authorised-applicator products.

  • SIKA-1 Pre-Bagged System
  • FOSROC Proofex Engage
  • PENTENS T-100

05 / Scope & timeline

What's included.

Scope
Site inspection, crack mapping, pressure injection, cementitious overlay, and curing protocol.
Typical timeline
1–3 weeks depending on basement size and condition.

06 / Service areas

Where we work.

  • Kuala Lumpur
  • Petaling Jaya
  • Subang Jaya
  • Shah Alam
  • Mont Kiara
  • Bangsar
  • Damansara Heights
  • TTDI
  • Sri Hartamas
  • Cheras
  • Selayang
  • Batu Caves
  • Puchong
  • Kepong
  • Setapak
  • Wangsa Maju
  • Ampang
  • Setia Alam
  • Kota Damansara
  • Sungai Buloh
  • Cyberjaya
  • Putrajaya
  • Kajang
  • Klang
  • Nilai

07 / FAQ

Service-specific questions.

Related guides

More on this from our guide library.