Skip to content
ODS Construction ChemicalsODSCC

Flooring

Epoxy Flooring

Self-levelling and high-build epoxy systems for retail, industrial, and warehouse floors.

01 / The problem

What goes wrong.

Bare concrete in industrial and retail environments dusts, stains, and degrades — and looks visibly amateur to customers and auditors.

02 / The solution

How we fix it.

Floor grinding to remove laitance and contaminants, primer coat, self-levelling or high-build epoxy in chosen colour, and optional non-slip top coat for wet areas.

03 / Project photos

Epoxy Flooring — project photo 1
Epoxy Flooring — project photo 2
Epoxy Flooring — project photo 3

04 / Materials

Authorised-applicator products.

  • FOSROC Nitoflor SL
  • SIKA Sikafloor 264
  • BOSTIK FloorPro 200

05 / Scope & timeline

What's included.

Scope
Grinding, primer, body coat, top coat, line marking if required.
Typical timeline
Retail unit: 3–5 days. Warehouse 1000+ m²: 1–2 weeks.

06 / Service areas

Where we work.

  • Kuala Lumpur
  • Petaling Jaya
  • Subang Jaya
  • Shah Alam
  • Mont Kiara
  • Bangsar
  • Damansara Heights
  • TTDI
  • Sri Hartamas
  • Cheras
  • Selayang
  • Batu Caves
  • Puchong
  • Kepong
  • Setapak
  • Wangsa Maju
  • Ampang
  • Setia Alam
  • Kota Damansara
  • Sungai Buloh
  • Cyberjaya
  • Putrajaya
  • Kajang
  • Klang
  • Nilai

07 / FAQ

Service-specific questions.

Related guides

More on this from our guide library.