Skip to content
ODS Construction ChemicalsODSCC

Cheras · Klang Valley

Flat Roof Waterproofing in Cheras

Flat roof waterproofing for Cheras commercial blocks, shoplots and condos. Liquid + torch-on membrane systems. CIDB G5, IRATEC certified.

01 / Overview

Flat Roof Waterproofing for Cheras buildings.

Cheras has more flat-roof shoplots and commercial blocks per square kilometre than almost any KL corridor. ODSCC re-waterproofs Cheras flat roofs using liquid-applied PU and torch-on bituminous membrane systems from SIKA, FOSROC, BOSTIK and PENTENS. CIDB G5 since 1997, IRATEC certified, authorised applicator for all six manufacturers we work with.

02 / Why Cheras

Local building stock & failure patterns.

The Cheras flat-roof inventory spans every era. The original Cheras Jaya, Taman Midah and Taman Connaught shoplot strips from the 1970s and 1980s have flat concrete slab roofs with original asphalt membrane now decades past service life. The 1990s and 2000s saw commercial expansion along Jalan Cheras with multi-storey retail and office blocks (Cheras Sentral, Leisure Mall area) using torch-on bituminous systems that are now at end-of-life around the upstands and M&E penetrations. The newer mixed-use developments around EkoCheras and Sungai Long use modern liquid-applied PU on podium roofs; we see early failures at parapet junctions and around drains where the original details were undersized. Cheras roofs in particular tend to have insufficient falls — we have done many jobs where the first step was adding a sloping screed before the new membrane could be applied. Ponded water is the single biggest predictor of premature membrane failure on a Cheras flat roof.

03 / Typical scope

What we deliver on site.

A typical Cheras flat-roof job: falls and ponding survey, debonded-section strip, crack repair, sloping screed where falls are insufficient, primer, base coat, reinforcement scrim at all upstands and penetrations, top coat, and an optional protective screed where foot traffic or M&E maintenance is expected. Liquid-applied PU is our default for accessible roofs; torch-on for larger uninterrupted areas. A 200 m² shoplot roof typically completes in 2–5 days; commercial blocks of 1,000 m²+ are staged across 1–2 weeks.

Full service overview: Flat Roof Waterproofing.

04 / FAQ

Questions from Cheras clients.

05 / Why ODSCC

Klang Valley waterproofing since 1997.

  • CIDB G5 since 1997 — eligible to quote on JMB and MC tenders directly.
  • IRATEC-certified for industrial rope-access work at height.
  • Authorised applicator for SIKA, FOSROC, MAPEI, BOSTIK, PENTENS and DENKA construction-chemical systems.
  • Free site inspection across the Klang Valley — written technical opinion at no cost.