Skip to content
ODS Construction ChemicalsODSCC

Kuala Lumpur · Klang Valley

PU Grouting in Kuala Lumpur

PU injection grouting for KL basements, lift pits, podium decks and shear-wall cracks. Stops active leaks at the source. Authorised SIKA, FOSROC, DENKA applicator.

01 / Overview

PU Grouting for Kuala Lumpur buildings.

Active leaks at slab cold joints, basement walls, lift pits and shear-wall cracks in KL cannot be sealed with surface coatings — the moving water pressure blows the patch off. ODSCC stops live leaks with polyurethane injection grouting using SIKA Injection-101 RC, FOSROC Conbextra and DENKA Hydro-Stop. CIDB G5, IRATEC certified, authorised applicator for the six brands we deploy.

02 / Why Kuala Lumpur

Local building stock & failure patterns.

PU grouting is the right tool when surface coating has already failed. Across KL we see three repeating active-leak patterns. First, KLCC-corridor and Bukit Bintang basement carparks and lift pits: cold-joint leaks and tie-bolt-hole seepage along the construction joints where positive-side membrane has aged out. Second, 1990s-2000s condo basements (Setapak, Wangsa Maju, Cheras, Sri Hartamas, Mont Kiara): shear-wall cracks where settlement or thermal movement opened a path; the leak appears on the carpark side as a wet stain that grows during monsoon months. Third, KL podium-deck planter boxes and roof-deck pools (KLCC, Jalan Ampang, Bangsar): construction-joint leaks below the deck slab that drip into the floor below. PU injection works on all three: hydrophobic PU reacts with the water on contact, expands to 20× volume and physically blocks the leak path. We follow with a surface dressing and a 24-hour observation period before sign-off.

03 / Typical scope

What we deliver on site.

A typical KL PU grouting job: crack and joint mapping, packer drilling at 30-45° on alternating sides of the leak, low-pressure injection of hydrophobic PU (SIKA Injection-101 RC for standard active-water, DENKA Hydro-Stop for high-flow ingress) until the path holds dry, packer removal, surface dressing, and a 24-hour observation. Typical KL crack pattern: 1-3 days on site; larger basement-wall jobs are staged across the working week. We work quietly so retail tenants below the work area can stay open.

Full service overview: PU Grouting.

04 / FAQ

Questions from Kuala Lumpur clients.

05 / Why ODSCC

Klang Valley waterproofing since 1997.

  • CIDB G5 since 1997 — eligible to quote on JMB and MC tenders directly.
  • IRATEC-certified for industrial rope-access work at height.
  • Authorised applicator for SIKA, FOSROC, MAPEI, BOSTIK, PENTENS and DENKA construction-chemical systems.
  • Site visits across the Klang Valley for projects we can take on — no charge for the visit itself.