01 / Overview
PU Grouting for Subang Jaya buildings.
Active leaks at slab cold joints, basement walls and lift pits in Subang Jaya cannot be sealed with surface coatings — the moving water pressure blows the patch off. ODSCC stops live leaks with polyurethane injection grouting using SIKA Injection-101 RC, FOSROC Conbextra and DENKA Hydro-Stop. CIDB G5, IRATEC certified, authorised applicator for the six brands we work with.
02 / Why Subang Jaya
Local building stock & failure patterns.
Subang Jaya combines an extensive shoplot stock (SS14, SS15, SS19, USJ) with newer retail and commercial developments around Sunway, plus a large residential base. The PU grouting requests we see follow the building age and water-table situation. Older SS-section shoplots from the 1980s have slab cold-joint leaks between ground and first floor that became active after the original waterproofing failed; these leaks damage the tenant’s stock during heavy rain and are typically the landlord’s problem to fix. The newer USJ retail and commercial developments have basement-level cold-joint leaks driven by the relatively high water table along the Klang River catchment. Subang condo lift pits — especially in the older blocks around the original Subang Jaya township — show classic active-leak patterns at tie-bolt holes and pour joints. PU injection is the right tool for all of these.
03 / Typical scope
What we deliver on site.
A typical Subang Jaya PU grouting job: crack and joint mapping, packer drilling at 30–45° on alternating sides of the crack, low-pressure injection of hydrophobic PU until the crack holds dry, packer removal, surface dressing, and a 24-hour observation period. We use SIKA Injection-101 RC for standard active-water leaks; DENKA Hydro-Stop for high-flow ingress. Typical crack pattern: 1–3 days. Larger basement-wall jobs: staged across the working week.
Full service overview: PU Grouting.
04 / FAQ
Questions from Subang Jaya clients.
05 / Why ODSCC
Klang Valley waterproofing since 1997.
- CIDB G5 since 1997 — eligible to quote on JMB and MC tenders directly.
- IRATEC-certified for industrial rope-access work at height.
- Authorised applicator for SIKA, FOSROC, MAPEI, BOSTIK, PENTENS and DENKA construction-chemical systems.
- Site visits across the Klang Valley for projects we can take on — no charge for the visit itself.