Skip to content
ODS Construction ChemicalsODSCC

KLCC · Klang Valley

Lift Pit Waterproofing in KLCC

Lift pit waterproofing for KLCC luxury condos, offices and serviced residences. Crystalline + PU injection. CIDB G5, IRATEC. Free inspection.

01 / Overview

Lift Pit Waterproofing for KLCC buildings.

KLCC towers run lifts to 50+ floors, and a leaking lift pit at the bottom puts the entire shaft at risk. ODSCC waterproofs KLCC lift pits using crystalline systems (PENTENS Crystalline Plus, FOSROC Brushbond RFX) plus PU injection for active leaks. CIDB G5, IRATEC-certified, and an authorised applicator for SIKA, FOSROC, MAPEI, BOSTIK, PENTENS and DENKA construction-chemical systems.

02 / Why KLCC

Local building stock & failure patterns.

The KLCC enclave — covering Jalan Ampang, Jalan P. Ramlee, Jalan Pinang and the Persiaran KLCC ring — has some of the highest building-density-to-water-table ratios in Kuala Lumpur. Many of the original luxury condo towers (e.g., around the Park Royal and Suria KLCC perimeter) are now 15–20 years old, and their deep basement lift pits sit several metres below the Sungai Bunus catchment groundwater level. The basement carparks here typically go three or four floors deep, and the lift pits at the very bottom take constant hydrostatic load. Once the original negative-side waterproofing fails — usually first at cold joints between pour stages — groundwater seeps in continuously, not just seasonally. Building managers usually notice it as standing water in the pit during the JMB monthly inspection, often combined with rust on the buffer springs. KLCC lift maintenance contracts are typically held by the original lift OEM (KONE, Otis, Mitsubishi) and they are quick to flag a wet pit as a warranty-voiding condition. We work with JMBs and the lift maintenance team to schedule the repair without taking the lift out of service for any extended period.

03 / Typical scope

What we deliver on site.

KLCC lift pit scope: dewatering, leak-path mapping with the lift held above, PU injection along cold joints and tie-bolt holes until the pit holds dry, then a two-coat crystalline system on the negative side, plus a cementitious top coat. We coordinate parking with the lift OEM each morning. Premium KLCC buildings sometimes require additional documentation for the JMB and insurance — daily progress sign-off, material certificates, and a final water-hold test report. Typical KLCC lift pit job: 4–7 days from dewatering to handover.

Full service overview: Lift Pit Waterproofing.

04 / FAQ

Questions from KLCC clients.

05 / Why ODSCC

Klang Valley waterproofing since 1997.

  • CIDB G5 since 1997 — eligible to quote on JMB and MC tenders directly.
  • IRATEC-certified for industrial rope-access work at height.
  • Authorised applicator for SIKA, FOSROC, MAPEI, BOSTIK, PENTENS and DENKA construction-chemical systems.
  • Free site inspection across the Klang Valley — written technical opinion at no cost.