Skip to content
ODS Construction ChemicalsODSCC

Cheras · Klang Valley

PU Grouting in Cheras

PU injection grouting for Cheras commercial buildings, basements and concrete cracks. Authorised SIKA & FOSROC applicator. Free site inspection.

01 / Overview

PU Grouting for Cheras buildings.

Active, flowing water leaks in concrete cannot be sealed with surface coatings — the pressure simply blows the patch off. ODSCC stops live leaks in Cheras commercial and residential buildings using polyurethane injection grouting (SIKA Injection-101 RC, FOSROC Conbextra, DENKA Hydro-Stop). The resin foams to 20× volume on contact with water, physically blocks the leak path, and bonds permanently to the substrate. CIDB G5, IRATEC-certified.

02 / Why Cheras

Local building stock & failure patterns.

Cheras stretches from Pudu in the city centre out to Kajang and covers an enormous range of building stock — older shoplots along Jalan Cheras, the high-rise commercial cluster around Cheras Sentral and EkoCheras, light-industrial blocks in Cheras Jaya, and dense newer condo development around Sungai Long. We see PU grouting requests across all of them, but for different reasons. Older Cheras shoplots leak at slab cold joints between ground and first floor — the kind of leak that ruins a tenant’s stock during heavy rain. The high-rise commercial blocks have lift pit and basement car-park cold-joint leaks driven by the high water table along the Sungai Bunus and Sungai Klang catchments. Light-industrial blocks in Cheras Jaya have crack-pattern leaks in suspended slabs and machine bases. And the newer condos around Sungai Long have settlement cracks at construction joints between podium and tower. PU grouting is the right tool for all of these because the leak is active and the water pressure is what blows surface treatments off.

03 / Typical scope

What we deliver on site.

A typical PU grouting job in Cheras: crack and joint mapping, packer drilling at 30–45° on alternating sides of the crack, low-pressure injection of hydrophobic PU resin until the crack holds dry, packer removal, surface dressing of the drill points, and a 24-hour observation period before sign-off. We use SIKA Injection-101 RC for most active-water leaks; for very high-flow ingress we switch to DENKA Hydro-Stop. A typical crack pattern (10–20 metres of crack length) completes in 1–3 days. Larger commercial slab-joint patterns are staged across a week.

Full service overview: PU Grouting.

04 / FAQ

Questions from Cheras clients.

05 / Why ODSCC

Klang Valley waterproofing since 1997.

  • CIDB G5 since 1997 — eligible to quote on JMB and MC tenders directly.
  • IRATEC-certified for industrial rope-access work at height.
  • Authorised applicator for SIKA, FOSROC, MAPEI, BOSTIK, PENTENS and DENKA construction-chemical systems.
  • Free site inspection across the Klang Valley — written technical opinion at no cost.